National Electricity Plan (NEP): 2022-32

The Central Electricity Authority (CEA) has notified the National Electricity Plan (NEP) (Vol-I Generation) for the period of 2022-32. The plan document includes the review of the last five years (2017-22), a detailed plan for the next five years (2022-27) and the prospective plan for the next five years (2027-32).

According to the NEP document, the projected All India peak electricity demand and electrical energy requirement is 277.2 GW and 1907.8 BU for the year 2026-27 and 366.4 GW and 2473.8 BU for the year 2031-32 as per 20th Electric Power Survey (EPS) Demand projections. The Energy Requirement & Peak Demand are inclusive of the impact due to increased adoption of Electric Vehicles, Installation of Solar roof tops, Production of Green hydrogen, Saubhagya scheme etc.

Based on generation planning studies carried out under the purview of preparation of National Electricity Plan for the period of 2022-27, the likely Installed Capacity for the year 2026-27 is 609,591 MW comprising of 273,038 MW of Conventional capacity (Coal - 235,133 MW, Gas - 24,824 MW, Nuclear - 13,080 MW) and 336,553 MW of Renewable based Capacity (Large Hydro - 52,446 MW, Solar - 185,566 MW, Wind - 72,895 MW, Small Hydro - 5,200 MW, Biomass - 13,000 MW, Pump Storage Plants (PSP projects) - 7446 MW) along with BESS capacity (Battery Energy Storage System) of 8,680 MW / 34,720 MWh.

The likely Installed Capacity for the year 2031-32 is estimated to be 900,422 MW comprising of 304,147 MW of Conventional capacity (Coal - 259,643 MW, Gas - 24,824 MW, Nuclear -19,680 MW) and 596,275 MW of Renewable based Capacity (Large Hydro - 62,178 MW, Solar - 364,566 MW, Wind - 121,895 MW, Small Hydro - 5450 MW, Biomass - 15,500 MW, PSP - 26,686 MW; excluding 5856 MW of likely Hydro based Imports) along with BESS capacity of 47,244 MW / 236,220 MWh.

The projection of total capacity addition is in line with the target of the country to achieve a non-fossil based installed capacity of around 500 GW by the year 2029-30.

NEP envisages that the share of non-fossil based capacity is likely to increase to 57.4% by the end of 2026-27 and may likely to further increase to 68.4% by the end of 2031-32 from around 42.5% as on April 2023.

The average PLF of the total Installed coal capacity of 235.1 GW is likely to be about 58.4% in 2026-27and that of 259.6 GW of coal based capacity is likely to be about 58.7 % in 2031-32.

As per the National Electricity Plan projections, the energy storage capacity of 16.13 GW / 82.37 GWh with PSP based storage of 7.45 GW capacity and 47.65 GWh storage and BESS based storage of 8.68 GW / 34.72 GWh is required by the year 2026-27. The storage capacity requirement increases to 73.93 GW (26.69 GW PSP and 47.24 GW BESS) with storage of 411.4 GWh (175.18 GWh from PSP and 236.22 GWh from BESS) by the year 2031-32.

The domestic coal requirement has been estimated to be 866.4 Million Tonnes for the year 2026-27 and 1025.8 Million Tonnes for the year 2031-32 and estimated requirement of 28.9 MT of coal imports for the plants designed to run on imported coal.

The total fund requirement for generation capacity addition for the period 2022-2027 is estimated to be Rs. 14,54,188 Crores and for the period 2027-2032 has been estimated to be Rs. 19,06,406 Crores. The estimate of fund requirement for 2027-32 does not include advance action for the projects which may get commissioned after 31.03.2032.

The average emission factor is expected to reduce to 0.548 kg CO2 / kWh net in the year 2026-27 and to 0.430 kg CO2 / kWh net by the end of 2031-32.